Dromon Concentrated Inspection Campaign (CIC) on MLC, 2006

29 July 2016  |  C16018

As already been informed through Dromon PSC Publication in March of this year, the Paris MoU will launch a Concentrated Inspection Campaign from September to November on Maritime Labour Convention (MLC), 2006.

NOTICE TO
Ship Owners / Managers / Operators  |  Surveyors  |  Flag Administrations

Dromon Port State and Flag State Inspection Department in co-operation with our Survey Department decide to initiate this CIC one month in advanced from Paris MoU aiming to identify possible deficiencies on board our fleet as well as potential deficiencies that may result in detention.

As with previous CICs, in practice CIC will be carried out in conjunction with the forthcoming surveys on all ship and surveyor will be informed through ISAT form (refer QS 3.2-1/Form 01). In case a ship is not due for any statutory survey within this period, the CIC will be conducted as an Occasional Attendance on board where this is feasible and practicable at a convenient port of call.

The Surveyor will use CIC checklist report including the same questions selected form Paris MoU (click here to download). When a deficiencies are found, Surveyors shall inform Dromon Head office by imposing a Notice of Recommendation as per Dromon QSP3.2-1/Form 02 indicating clearly the recommendation and due date of rectification. Any imposed deficiency will be shown on the survey status of the ship and our online platform ‘’ERETES’’ for further actions from Manager.

Share this post:

Related Posts

February 21, 2024

Belize Policy on Tokyo MoU