Ballast Water Management Convention is coming into force on the 8th of September 2017

14 September 2016  |  C16022

Following Finland’s accession of the International Convention for the Control and Management of Ships’ Ballast Water and Sediments (BWM Convention), IMO has confirmed that the Convention will enter into force on 8th of September 2017.

NOTICE TO
Ship Owners / Managers / Operators  |  Surveyors  |  Flag Administrations

Finland’s agreement is said to bring the combined tonnage of the Convention’s 52 contracting states to 35.14% of the world’s merchant shipping fleet. The BWM Convention states that will enter into force 12 months after a minimum of 30 states, representing 35% of world merchant shipping tonnage had ratified the agreement.

“This is a truly significant milestone for the health of our planet,” said IMO Secretary-General Kitack Lim.

The aim of the BWM Convention is to engage States to minimise and ultimately eliminate the transfer of harmful aquatic organisms and pathogens through the control and management of sea ballast water and sediments.

The BWM Convention apply to all ships except:

  • ships not designed or constructed to carry ballast water
  • ships operating exclusively in waters under the jurisdiction of a Party, unless the party determines that the discharge of ballast water from such ships would impair or damage their environment
  • warships, naval auxiliary or other ships owned or operated by a Party
  • ships with permanent ballast water not subject to discharge.

All ships will be required by 8th of September 2017 to carry on board:

  • a “Ballast Water Management Plan” approved by the Administration or the Recognized Organization (RO),
  • a “Ballast Water Record Book” for the recording of each operation concerning ballast water management; and
  • an “International Ballast Water Management Certificate” with a five year validity and subject to annual, intermediate and renewal surveys.  For those flag States that have not ratified the Convention, DBS will be issuing an “International Ballast Water Management Statement of Compliance”.

All vessels must be installed with a Ballast Water Management System for the treatment of ballast water before discharged is made.  As per the IMO Resolution A.1088(28) a schedule has been implemented for the installation of BWM treatment technology.  This states that existing ships must be installed with a BWM treatment technology at the “first IOPP renewal survey after the entry into force of the Convention”.  Therefore existing ships must be retrofitted with a BWM treatment technology at the first IOPP renewal survey after 8th of September 2017.  For ships constructed after the entry into force date, will have to be compliant on delivery.

123

Short film “Ballast Water Management – What you Really need to Know”

Act now

Ship-owners / Managers are recommended to take action for the implementation of the Convention’s requirements.

Ship Owners / Managers must prepare and submit to Dromon Engineering Department the BWM Plan as soon as possible, to avoid any problems or delays due to the submission of a great number of plans in the very close period to the entry into force of the Convention.

In addition, DBS survey department will start from January 2017  to conduct initial surveys and issue the applicable certificate to the ship.  An initial survey can be carried out on board after the BWM Plan has been reviewed and approved on behalf of the flag State.  In case the BWM Plan has not been reviewed and approved before the initial survey, Dromon Engineering Department will be issuing a letter confirming that the BWM Plan has been received and is under review.

Ship owners / Managers must start considering the installation of a BWM treatment system on board their ships.  Dromon Engineering Department can assist and guide on the requirements for the retrofitting of such equipment on board.  In any case, each ship must be installed with a BWM treatment system by the first IOPP survey after 8th of September 2017.  In case a BWM treatment system is installed after the approval of BWM Plan, the Plan must be re-submitted to Dromon Engineering Department for re-approval taking into account the installation of the treatment plant (i.e. Regulation D-2).

Dromon Technical Publication on Ballast Water Management Convention is to provide further guidance and information about the Convention and the Convention’s requirements.